EAST KETTERING STRATEGIC URBAN EXTENSION (SUE) PHASE 1 ACCESS ROADS 


Client:
Hanwood Park LLP (CHECK) 

Location: Kettering, Northamptonshire 

Value: £12.5m 

Breedon were appointed Principal Contractor by Hanwood Park LLP to Design and Construct the Phase 1 Access Roads SUE. The project was located on the Eastern edge of Kettering Town, Northamptonshire, and was the initial stage in unlocking over 328 hectares of agricultural land for a proposed mix use development. The finished development will include: 

  • Up to 5,500 dwellings  
  • A secondary school  
  • Up to 4 primary schools  
  • Open space (covering park(s) and play areas)  
  • Local centre facilities (e.g. shops and health care) 

The site was bound to the south by the A14 trunk road and a number of existing dwellings. A significant element of the works involved realigning the approach to Junction 10 on the A14, with a speed limit of 70mph and AADT of 68,000. Breedon’s Project Team managed the design and construction of the project with Temporary Works Co-Ordinators and Traffic Safety Officers working within the team to provide the safe and successful delivery achieved.  

Key requirements of the contract included: 

  • Extensive site clearance and demolition across 18.15 hectares  
  • Large scale earthworks operations including 90,000m3 of bulk excavations.  
  • Construction of 2.4km of new single carriageway to Northampton County Council Section 38 adoptable standard 
  • Construction of a new 45m diameter Section 278 roundabout  
  • Construction of a new Section 278 signalised access junction on the Barton Road.  
  • Reconfiguration of the Section 278 Cranford Road junction.  
  • Associated section 185, 104 and 98 drainage provisions.  
  • Installation of over 2km of trunk foul network to depths of 9.5m. 
  • Installation of 850m of surface water network to depths of 8.5m. 
  • The provision of 2.2km of utilities corridor for new site service installations. 
  • Ecology mitigation measures, including newt fencing, construction of new newt habitats, and relocation of badger setts. 

Other Civil engineering projects


    Our use of cookies

    We use cookies for website performance, to provide social media features and to analyse our traffic. We also share information about your use of our site with our analytics partners who may combine it with other information that you’ve provided to them or that they’ve collected from your use of their services.

    For more detailed information about the cookies we use, see our Cookie policy


    Analytics cookies

    We’d like to set Google Analytics cookies to help us to improve our website by collecting and reporting information on how you use it. The cookies collect information in a way that does not directly identify anyone.

    For more detailed information about the cookies we use, see our Cookie policy

    :